Abstract:
The study in this paper contains three parts: Theoretical base of flowing back earlier and the corresponding field measures after fracturing,the study of rational production mode of fracturing wells and the corresponding measures of reservoirs management.It should be noted that above works must be done simultaneously so that an ideal fracturing result may be expected,in the meantime,it may also serves better for oil fields' water control and other comprehensive measures as well.It is demonstrated in details in the paper,and a field case is analyzed in the end.