留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码
韩学彪, 陈伟, 杨毅, 袁胜斌. 元素测、录井技术测量精度对比分析[J]. 海洋石油, 2023, 43(3): 58-63. DOI: 10.3969/j.issn.1008-2336.2023.03.058
引用本文: 韩学彪, 陈伟, 杨毅, 袁胜斌. 元素测、录井技术测量精度对比分析[J]. 海洋石油, 2023, 43(3): 58-63. DOI: 10.3969/j.issn.1008-2336.2023.03.058
HAN Xuebiao, CHEN Wei, YANG Yi, YUAN Shengbin. Comparative Analysis of Measuring Accuracy of Element Wireline Logging and Mud Logging Technique[J]. Offshore oil, 2023, 43(3): 58-63. DOI: 10.3969/j.issn.1008-2336.2023.03.058
Citation: HAN Xuebiao, CHEN Wei, YANG Yi, YUAN Shengbin. Comparative Analysis of Measuring Accuracy of Element Wireline Logging and Mud Logging Technique[J]. Offshore oil, 2023, 43(3): 58-63. DOI: 10.3969/j.issn.1008-2336.2023.03.058

元素测、录井技术测量精度对比分析

Comparative Analysis of Measuring Accuracy of Element Wireline Logging and Mud Logging Technique

  • 摘要: 元素测、录井技术在岩性识别、界面卡取及储层评价等方面发挥着越来越重要的作用,在应用过程中发现两者数据之间存在不同程度的差异,给解释研究工作带来了困难。不同岩性元素测、录井数据之间的对比表明,元素Si、K、Fe、Ca等受岩性影响小,两者曲线平均相关系数大于77.5%,变化趋势吻合度高,可以较好地反映地层的真实变化趋势;Al、Mg元素受岩性影响大,碳酸盐岩地层两者之间相关系数大于80%,远远好于在花岗片麻岩地层;低含量Ti、S元素,元素录井技术测量结果稳定性更好,精度也更高。根据对比情况,分析出现测量差异的原因主要是两者测量原理、仪器分辨率及定量解析过程中影响因素不同等造成的。通过充分了解元素测、录井技术的差异性,根据不同地层的测量需求,选择具有针对性的测量方式,充分发挥好元素测、录井技术对现场施工方案的制定及后续数据挖掘的作用。

     

    Abstract: Element wireline logging and mud logging techniques play an increasingly important role in solving the lithology identification, interface determination and reservoir evaluation.The outcomes measured by two methods had differences in various degree. This brought problems to interpretation work. According to the comparison of different lithological elements, the data showed that the main elements Si, K, Fe and Ca had low measurement error. The curve change trend had a high agreement degree, which can better reflected the real change trend of the formation. While Al, Mg, Ti, S and other elements were different in varying degrees. The reasons for the measurement differences are mainly caused by measurement principle, instrument resolution and influencing factors in the process of quantitative analysis. Fully understanding the differences between the two technologies and choosing proper method according to different measure requests can be benefits for the well-site construction plan and the follow-up data mining.

     

/

返回文章
返回