ZHU Ke-shang, CHEN Qing-chun. Application of High Qual ity and Fast Techniques in Chengbei 1D Cluster Wells[J]. Offshore oil, 2004, 24(2): 93-96.
Citation: ZHU Ke-shang, CHEN Qing-chun. Application of High Qual ity and Fast Techniques in Chengbei 1D Cluster Wells[J]. Offshore oil, 2004, 24(2): 93-96.

Application of High Qual ity and Fast Techniques in Chengbei 1D Cluster Wells

  • Based on analyzing the drilling operation difficulty in CB1D cluster wells,six wells were drilled with the high speed by controlling safety and high quality in full process quality and by using PDC bit cooperating drilling,steering drilling,top drilling,high quality drilling fluids. The success rate of electric completing logging is as high as 100%.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return