SHI Fuquan, LI Xiangfang, YANG Xi, YANG Baojian, LUO Man. Calculation and Reliability Analysis of the Shut-in Water Hammer Pressure in Case of Blowout[J]. Offshore oil, 2021, 41(1): 78-82. DOI: 10.3969/j.issn.1008-2336.2021.01.078
Citation: SHI Fuquan, LI Xiangfang, YANG Xi, YANG Baojian, LUO Man. Calculation and Reliability Analysis of the Shut-in Water Hammer Pressure in Case of Blowout[J]. Offshore oil, 2021, 41(1): 78-82. DOI: 10.3969/j.issn.1008-2336.2021.01.078

Calculation and Reliability Analysis of the Shut-in Water Hammer Pressure in Case of Blowout

  • In case of overflow or blowout during drilling, the well should be shut down immediately. During the shut-in process, the BOP needs to withstand the shut-in water hammer pressure. This paper analyzes and calculates the shut-in water hammer pressure when the blowout jet is natural gas, drilling fluid and gas-liquid two-phase mixture. Based on this, the shut-in reliability analysis is performed. According to the analysis, only when the blowout jet is drilling fluid and the jet velocity is large, "Soft Shut-in" should be selected to reduce the shut-in water hammer pressure.In other cases, "Hard Shut-in" should be selected to reduce formation fluid intrusion.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return