LIU Ruming, YU Han, ZHANG Guoqiang, XIA Liangbing. Application of FASTrak HD Pressure Test and Sampling While Drilling in Bohai Oilfield[J]. Offshore oil, 2022, 42(4): 67-70. DOI: 10.3969/j.issn.1008-2336.2022.04.067
Citation: LIU Ruming, YU Han, ZHANG Guoqiang, XIA Liangbing. Application of FASTrak HD Pressure Test and Sampling While Drilling in Bohai Oilfield[J]. Offshore oil, 2022, 42(4): 67-70. DOI: 10.3969/j.issn.1008-2336.2022.04.067

Application of FASTrak HD Pressure Test and Sampling While Drilling in Bohai Oilfield

  • Wireline formation test is difficult to implement and has high risk because it is easily affected by well trajectory and well conditions in directional well operation. As result, it has a great impact on reservoir evaluation. The FASTrak HD of Baker Hughes company is not limited by well trajectory and has low operation risk. It not only retains all functions of Testrak, but also adds fluid analysis module, pressure drop pump and sample barrel module. Moreover it is capable of sampling so that the problem of pressure measurement and sampling of directional wells is solved. This tool has been successfully applied for the first time in Bohai Oilfield and provides a new operation mode for pressure measurement and sampling of subsequent directional wells.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return