CHENG Xinping, ZOU Xinbo, ZHANG Chengfu, YANG Guang, ZHANG Fenghui, MA Xichao. Technology and Practice in Dump Flooding or Pumped Water Injection in Huizhou 25-8 Oilfeld[J]. Offshore oil, 2018, 38(1): 38-42. DOI: 10.3969/j.issn.1008-2336.2018.01.038
Citation: CHENG Xinping, ZOU Xinbo, ZHANG Chengfu, YANG Guang, ZHANG Fenghui, MA Xichao. Technology and Practice in Dump Flooding or Pumped Water Injection in Huizhou 25-8 Oilfeld[J]. Offshore oil, 2018, 38(1): 38-42. DOI: 10.3969/j.issn.1008-2336.2018.01.038

Technology and Practice in Dump Flooding or Pumped Water Injection in Huizhou 25-8 Oilfeld

  • L30up, the main reservoir in Huizhou 25-8 oilfeld, encountered an awkward situation in which the formation energy declined too fast but the water energy was in short supply. Meanwhile, there are no ground water injection equipment or pipe network facilities in the feld and the water flooding cannot be fulflled. Based on the geological analysis and the study on the compatibility of reservoir water, the author developed and designed the process program of Y-Block dump flooding/pumped water injection and canned ESP pump flooding/pumped water injection, in which the present oil wells in the oilfeld are utilized as the injection wells and the water in the layer above L30up injected into L30up. This design also meets the requirement of monitoring the temperature, pressure, and flow rate during injection, controlling the rate of water injection and protecting the cable. Field application showed that the water injection was effective, the cost of oilfeld development reduced, and the development effect by water flooding in the oilfeld enhanced.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return